The underground pump station for the water replenishing project from Niulan River to Dianchi lake in Yunnan Province is located in strong karst area, with large-scale karst carves, funnels and underground rivers exposed on the surface as well as underground river pipeline, karst caves and strong dissolution belt developed underground. To avoid the karst development zone and take effective measures to solve the karst water burst and collapse is one of the technical problems in the construction. By analyzing the karst features and development regularities, we adopted three measures for the construction (1) the long-span underground main power house is built in weak karst area to avoid underground river and strong corroded groove, and the bottom boundary of anti-seepage curtain for the underground main power house is determined 10-20m below the 1 695m elevation of micro-karst area; (2) forepoling is employed for large strong karst area before the excavation of underground caverns; (3) areas of safety monitoring for the power house’s operation are decided.
Key words
underground pump station /
karst problem /
forepoling /
seepage-proofing bottom boundary /
safety monitoring
{{custom_sec.title}}
{{custom_sec.title}}
{{custom_sec.content}}
References
[1] 李明华, 尹 浩. 干河泵站工程地下厂房开挖施工[J]. 云南水力发电, 2013, 29(3):38-40. (LI Ming-hua, YIN Hao. Excavation of the Underground Powerhouse for Ganhe River Pumping Station Project [J]. Yunnan Water Power, 2013, 29(3):38-40. (in Chinese))
[2] 章 魏, 刘俊华. 干河泵站地下厂房谐向应分析[J]. 人民长江, 2013, 44(12):21-23. (ZHANG Wei, LIU Jun-hua. Harmonious Respond Analysis for Ganhe River Pumping Station Underground Power Plant[J]. Yangtze River, 2013, 44(12):21-23. (in Chinese))
[3] 陈 绩, 陈兴聪. 牛栏江-滇池补水工程初步设计报告[R]. 昆明:云南省水利水电勘测设计研究院, 2010.(CHEN Ji, CHEN Xing-cong. Preliminary Design Report for the Water Replenishing Project of Niulan River and Dianchi Lake [R]. Kunming: Yunnan Provincial Water Conservancy and Hydropower Survey and Design Research Institute, 2010. (in Chinese))
[4] 梅 伟. 干河泵站地下厂房防渗排水体系设计[J]. 人民长江, 2013, 44(12):24-26.(MEI Wei. Seepage Control and Drainage System Design for Ganhe River Pumping Station’s Underground Powerhouse [J]. Yangtze River, 2013, 44(12):24-26. (in Chinese))